Balance Sheet
Weigh gains vs. losses for each solution option to support selection decisions
What is Balance Sheet?
A Balance Sheet is a decision-support tool that lists everything gained and everything lost or risked by a particular decision. Unlike a cost-benefit analysis (which focuses on financial metrics), a balance sheet captures qualitative factors: team morale, customer trust, organizational learning, opportunity cost. It is especially useful for decisions where the numbers do not tell the whole story.
When to Use It
- •In Step 6 (Evaluate) to weigh the overall value of the improvement
- •When deciding whether to standardize a solution or revert to the old process
- •When presenting results to stakeholders who care about more than financial ROI
How to Use It: Step by Step
- 1
List gains
Everything positive that resulted from the improvement: cost savings, time savings, error reduction, morale improvement, customer satisfaction, knowledge gained.
- 2
List losses or costs
Everything negative: implementation cost, training time, temporary productivity dip, increased complexity, opportunities deferred.
- 3
Assess the balance
Do the gains outweigh the losses? Are the losses temporary while the gains are permanent? Is the trade-off acceptable?
- 4
Make the decision
Based on the balance, recommend: proceed (gains dominate), iterate (mixed results), or revert (losses outweigh gains).
Example
Evaluating a new automated scheduling system
Gains: 12 hours/week saved in manual scheduling, 23% fewer scheduling conflicts, staff satisfaction up 15 points. Losses: $18K implementation cost, 3-week learning curve with 10% productivity dip, 2 staff members resistant to change. Balance: Gains are permanent and recurring; losses are one-time. The 12 hours/week savings alone pay back the $18K in 6 months. Recommendation: Standardize.
Pro Tips
- ✓Include intangible gains and losses — team learning, customer trust, and cultural shift matter
- ✓Distinguish between one-time costs and recurring costs or savings
- ✓If the balance is ambiguous, it usually means more data is needed before deciding
Facilitation Guide
Run a 2-hour selection and planning workshop. Review the shortlisted ideas from Step 3 (10 min). Define evaluation criteria as a team and assign weights by consensus (20 min). Score each solution independently, then discuss and reconcile scores (30 min). Select the winning solution and document the rationale (10 min). Build the RACI chart — list tasks, assign R/A/C/I for each team member (20 min). Draft the implementation timeline with milestones, owners, and dates (25 min). Close with a risk brainstorm and mitigation plan (15 min).
Other Tools in Step 4
Criteria Matrix
Score and rank solutions against weighted criteria
Paired Comparisons
Systematically compare options in pairs to produce a ranked list
RACI Chart
Assign roles: Responsible, Accountable, Consulted, Informed
Implementation Plan
Timeline, resources, milestones, and risk mitigation
Cost-Benefit Analysis
Compare the financial costs and projected benefits of proposed solutions
Try Balance Sheet in your own project
Start Free